Quality Manager
Location: Doha, Qatar
Professional Summary
An ambitious & well-coordinated professional with over 20+ years of experience in Diversified Civil Constructions, presently associated with Gulf Contracting Co. W.L.L., Doha – Qatar, in current role of Project Quality Lead.
Key expertise
· Knowledge in modern construction methodologies in compliance with quality and safety standards.
· Experience in construction as Quality Engineer, with good knowledge of local regulatory, local specifications QCS 2014, ASHGHAL, KAHRAMMA, RLIC Standards & QSHES procedures and with various international code of practices.
· Good interpersonal skills of communications, work ethics, co-ordination and customer relationship management, listening skills.
· Self –Motivated, demonstrated abilities in leadership, effective co-ordination, and Problem solving and ensuring quality and safety works without compromising.
· Having 18+ years of diversified civil project work experience in Middle East (Qatar) as Quality Professional with key experience as below
Ø Water treatment works – 6 yrs.
Ø Industrial Bldgs. – 1+ yrs.
Ø Power transmission substation – 3+ yrs.
Ø Oil & Gas – 5 Yrs.
Ø High rise Bldgs. – 2+ yrs.
· Sound technical knowledge in Water treatment plant works (Waste water & Desalination plants), Industrial Bldgs., Energy Substations related to Civil works, Road works, MEP finishing works (fit out).
· Part of successful teams which have delivered successful Civil and Building projects for both Private and Government agencies on time and budget
· Project completion dossiers.
Technical Skills
– Audit (Planning, conducting, Reporting & follow up).
– Developing Quality manual, procedures, process mapping
– Proficient in MS office
Educational Qualification
– Graduated as a Bachelor of Engineering in Civil (B.E) from U.V.C.E, Bangalore (affiliated to Bangalore University) in the Academic Year 1999-2000
Additional Credentials
– Certified IRCA Lead Auditor of ISO9001 :2015 QMS from BSI
– Certified UPDA Engineer “Grade A” from the Ministry of Municipality & Urban planning (Engineers & consulting office Accrediting committee) Qatar
– Certified PMP Professional (PMP # 2692637) from PMI
– Certified IOSH Manage Safely
– Graduate Certificate on Construction Quality Management System from National Institute of Construction Management and Research (NICMAR) Pune, India.
– Completed Level#2 (Certificate # 1303694) in Health and safety at work place by HABC, U.K
Achievements
– Leading the Quality Team and ensure the project completion and handover to Client with good appreciation on Quality/SHES compliance and initiatives for various private and Government sector projects earlier.
– Group Interserve Divisional finalist for leading the Quality team and demonstrating the value of “ DO THE RIGHT THING” in Musherib Down Town – Arabtec Project
– Client appreciation for Quality and SHES compliance in the Umm Al Houl power & Desalination plant.
– Best employee award in GCC @ 2019
– Appreciation award from GCC GM for the outstanding performance in lead role in GCC Quality culture @RLIC Projects.
Work Experience (Qatar- 18yrs +)
1. Organization : Gulf Contracting Co. W.L.L
Current Position : Project QA/QC Lead @RLIC Projects
Principal Accountabilities
Ø Prepare, review and implement of the project specific Quality plan, ITP’s and check list.
Ø Lead and manage the project QAQC team with guidance on the routine inspection activities in line to project ITP plan to ensure all works executed as per project specifications and relevant standards.
Ø Identify & Establishing project quality objectives in co-ordination with the Project manager
Ø Maintaining and distribution of the Quality records as per the organization Quality Management system
Ø Review of the subcontractor Quality plan / ITP’s /Method statement to verify/check the adequacy relevant to the project requirements
Ø Involve in the Quality plan implementation and review with the Sr. Management on project objectives and KPI’s
Ø Liaise with the project manager in identifying and establish the material procurement Register and Sub contractor procurement register relevant to the project requirements.
Ø Co-ordinate, interface with project stakeholders for onsite and offsite inspections as required.
Ø Liaise with 3rd party material testing agency and with client/consultant to carry out the test on material / activity periodically as per the project requirement
Ø Preparing audit schedule & conducting audit on suppliers and subcontractors to check the adequacy of the project requirements / ISO9001 Stds.
Ø Involve & participate with Sr. Management / External Agency during internal / external audit process.
Ø Ensure copies of relevant regulatory requirements, Codes of practice and standards are readily accessible at work place for reference.
Ø Preparation of the project specific Quality induction to all project staff and enforce the implementation.
Ø Preparation of project training schedule for project team and development of the site QC Personnel’s and motivate & Mentor them in the implementation of the project inspection test process with continuous improvements.
Ø Identifying the non-conforming products, analyzing the root cause and taking corrective measures to mitigate at initial stage.
Ø Conducting periodic Quality meetings with project staff to review the action plan on the non-conforming / Quality issues and on continual improvement process.
Projects summary (Qatar)
1. Project Name NFE EPC-1 Early Works Camp Accommodations & Facilities
Client Qatar Gas (QG)
Main Contractor Chiyoda Corporation JV Technip Energies (CTJV).
Civil Contractor Gulf Contracting Co. W.L.L
Duration Aug 2021 to Current
Project Brief:
This project is part of the Northfield expansion EPC-1 early works to construct the Camp accommodation facilities to accommodate CTJV staff (1478 persons) @RLIC, Construction completion in four phase, with the earth works, prefabricated Accommodation buildings, Ancillary Bldgs. U/G Utility networks (sewer, potable, fire , Fire alarm , telecom , instrumentation ..) Camp roads, Camp tie in works, new external road (4.3Km) from the camp to the public road
2. Project Name Umm Al Houl Power – RO Expansion
Client Umm Al Houl Power (UHP)
Main Contractor Samsung C& T.
Consultant Mott Macdonald.
Civil Contractor Gulf Contracting Co. W.L.L
Duration March 2019 to August 2021
Project Brief:
The Desalination project situated in Doha south at Al Wakra Contained Capacity of producing 65MIG of potable water from desalination process on completion. The civil scope work consist of constructing the process tanks & Buildings DAF, Electrical Bldg , UF & RO Bldgs, Chemical tanks , Water island , Potable water treatment facilities , Control Bldgs with concrete protection coating works , Road works
3. Project Name Phase 13 – Qatar Power transmission expansion
Client Kaharamaa
Main Contractor Siemens AG
Consultant EPE / EDF
Civil Contractor Gulf Contracting Co. W.L.L
Project Duration August 2017 to March 2019
Project Brief:
The project Contained construction of 34Nos power transmission substations inclusion of upgrade
and construction of new transmission stations (66/11Kv, 220/132/11Kv) at various locations interior
and exterior of Doha with all Civil /interior finishes & Road related works.
4. Project Name Doha West Sewage Treatment Plant (DWSTP), Extension # 5
Client ASHGHAL (Public works Dept – Drainage)
Main Contractor Marubeni Corp.
Consultant Egis International.
Civil Contractor Gulf Contracting Co. W.L.L
Duration March 2015 to May 2017
Project Brief:
The project situated at Doha west (Sailiyah) Contained Capacity of Treating 105MLD of waste Effluent and was designed to meet the demand up to 2050 The plant consists of Primary (Aeration Tanks) , Secondary(Secondary Settlement tanks, Balancing Tank, Aerobic Digestion Tank ) & Tertiary treating units ( Pressure Sand Filter & smart track Ultrafiltration Bldgs.) , Pumping station Bldg. along with 05 Substations of 66/11 KVA , utility /process network Pipeline works and 3.5 Km of Road works .
5. Project Name Msheireb Down town Doha, Phase – 2
Client Msheireb Properties
Main contractor Arabtech JV
Consultant TIME Qatar.
Civil Contractor Gulf Contracting Co. W.L.L
Project Duration February 2013 to February 2015
Project Brief:
Construction of 3Nos mixed purpose high-rise Building’s located in Msherieb Down town Doha
Phase -2, The Bldgs. consist of 4Basement level + 20 levels super structure with civil scope of works
6. Project Name Barzan Onshore Project Package – 2
Client Qatar Gas (QG)
Main EPC Contractor Japan Gas Corporation (JGC)
Civil Contractor Gulf Contracting Co. W.L.L
Duration July 2011 to Jan 2013
Project Brief:
The EPC Project included Design, Construction and completion of 25 buildings in Process & Non-Process zones over 3.2 km2. The design was governed by feed spec & drawings from RASGAS, developed to conceptual level by JGC with project wide standardization & further design implemented by GCC. Total Built up area including transformer yards is 40,000 m2 MEP works included chillers of net capacity 2,643 tons, fire detection and protection systems including connectivity to control building Civil works include asphalt works, hardscape and cable trenches
7. Project Name Doha West Sewage Treatment Plant (DWSTP), Extension # 3
Client ASHGHAL (Public works Dept – Drainage)
Main Contractor Marubeni Corp.
Consultant Nippon- Koei (UK)
Civil Contractor Gulf Contracting Co. W.L.L
Duration April 2008 to Jun 2011
Project Brief:
The project situated at Doha west (Sailiyah) Contained Capacity of Treating 195MLD of waste Effluent and was designed to meet the demand up to 2050 The plant consists of Primary (Inlet tanks, Aeration Tanks) , Secondary(Secondary Settlement tanks, Balancing Tank, Aerobic Digestion Tank ) & Tertiary treating units ( Sand Filter & Ultrafiltration Bldgs.) along with 10 nos secondary substations of 66/11 KVA , Process pipeline networks , offices interior fit out and 2.5 Km of Road works .
8. Project Name Qatar Power Transmission Expansion System Phase VII
Client Qatar General Electricity & Water Corporation (KHARAMMA)
Consultant Energo-Fichtner Consortium (EFC)
Main Contractor SIEMENS Consortium
Civil Contractor Gulf Contracting Co. W.L.L
Duration Jan 2007 to March 2008
Project Brief:
The project Contained of Construction of 4nos substation’s with capacity ranging from 66/11kv, 220/66/11kv & 132 kv, located around the exterior & interior portion of the Messaied Industrial city, has a part of the Qatar’s major expansion for the power supply needs inclusive of civil/interior finish.
9. Project: Central Energy Plant (Doha 2006 Asian Games Village / Hamad Medical City)
Client Building Engineering Dept. (BED)
Main Contractor Trags Electrical & Engineering
Consultant Fedcon (Federation Design of Construction, Thailand)
Civil Contractor Gulf Contracting Co. W.L.L
Duration July 2005 to Oct 2006
Project Brief:
The project Contained of the centralized utilities supply Industrial Bldg(Chilled water for A/C Units, potable water supply, Irrigation water, Telecommunication network Exchange(Q-tel) & office units for the maintenance works) to the total village , with the centralized 4 storey car parking bay with all interior finishes for the offices & Infrastructure works within the village.
Work Experience (India – 5yrs)
2. Organization : Mfar Constructions Pvt Ltd
Position : QA/QC Engineer
From : December 2003 to June 2005
Project Brigade Gardenia.
Client Brigade Groups (Real Estate Ltd)
Consultant Chetana Consultants
Contractor Mfar Constructions Pvt Ltd
Duration Dec 2003 to Jun 2005
Project Brief:
The project Contained of the 4 Blocks of the double level Basement + Ground + 16 Storeys High rise Residential Units Bldg. with two level parking @ Basement. with self-contained Recreation facility
3. Organization: Daya MK Constructions Pvt Ltd
Position : Civil Engineer
From : September 2000 to November 2003