Igarando Emmanuel

Logo

Instrument Technician
Location: Doha, Qatar


IGARANDO EMMANUEL
INSTRUMENT LEAD FOREMAN/SUP’V. TUBING FITTER
HYDROTEST TECHNICIAN
AUTOCLAVE TUBING SPECIALIST
IGARANDO’S HOUSE, MOZI WARI, OLOBIRI/KAIAMA TOWN.
KOLOKUMA/OPOKUMA LGA, BAYELSA STATE

DATE OF BIRTH
SEX
NATIONA-
LITY
STATE OF ORIGIN
LOCAL GOVT AREA
HOME TOWN
MARITAL STATUS
RELIGION
HOBBIES

JUNE 15TH 1988
MALE
NIGERIAN
BAYELSA
KOLOKUMA/OKPOKUMA
KAIAMA TOWN
MARRIED
CHRISTIA-NITY
SINGING, TRAVELLING,
TEACHING CHILDREN

ABOUT IGARANDO:
I am a person with keen interest to learning new trends in line with the ELECTRICAL & INSTRUMENTATION body of knowledge, and any other privileged field of endeavor.
I am always teachable and learnable, hence I posses a great ability of being a good team player and will gladly play my role effectively to achieving the goals, mission and vision of any organization I find myself.

OFF THE JOB
I also have passion for looking after CHILDREN and learning new LANGUAGES (Whether local or foreign) to aid my communication Skills.

QUALIFICATIONS AND TRAININGS WITH DATE
1.FIRST SCHOOL LEAVING CERTIFICATE (FSLC) 2000
2. NATIONAL BUSINESS & TECHNICAL EXAMINATION BOARD(NABTEB) 2011
3. VOCATIONAL AND TECHNICAL EDUCATION [option in Elect/Elect](B. Tech) IN VIEW. (2022)
RIVERS STATE UNIVERSITY
4. PROCESS INSTRUMENTATION AND CONTROL/INSTRUMENT PIPE FITTING
CERTIFICATE 2009.
5. PERMIT HOLDER(ePTW, eJSA, Work Management System WMS) ExxonMobil-March 2020
6. HELICOPTER UNDERWATER ESCAPE TRAINING(HUET)CHARKIN valid Through 2024
7. COMPRESSED AIR EMERGENCY BREATHING SYSTEM(CA EBS)
8. COVID 19 vaccine (1st and 2nd dose completed)

WORK EXPERIENCE WITH DATE:

COMPANY: SPIE NIG LTD
DATE: SEPTEMBER 2021-DECEMBER 2021
CLIENT: EXXON-MOBIL
POSITION:INSTRUMENT PIPE FITTER SUPPERVISOR
PROJECT: FULL FIELD SHUT DOWN(FFSD)
LOCATION: ERHA FPSO
RESPONSIBILITIES:
*study and Interpretation of Equipment location & Hook up drawings prior to installation. .
*Conduct daily tool box meeting and perform planning of daily job activities.
*Assigning Daily work responsibilities to Instrument Foreman and technicians accordingly.
*Perform routine site walk through to inspect and oversee foreman and technicians on the job.
*Perform fabrication of Support for the installation of instrument air manifold.
*Perform coning and dicing of 9/16″ Autoclave tubing for specific High Pressure installation.
*Perform in line service leak test on installed autoclave lines using methanol.
*Support commissioning team during commissioning & start up activities.

COMPANY: Obital & Oranges NIG LTD
DATE: FEBRUARY 2021-August 2021
CLIENT: BW Offshore/Addax
POSITION:E&I TECHNICIAN/Tubing fitter/Hydrotest team lead.
PROJECT: FPSO maintenance and UPGRADE
LOCATION: FPSO SENDGE BERGE
RESPONSIBILITIES:
*Destruct, Construct and re installation of badly corroded tubing supports.
*Fabrication & Installation of Instrument & JB supports using Unistrut channel
*Installation of Instruments, JB’s on supports and stanchions.
*Hydro testing of prefab spools.
*Trouble shooting of faulty Instrument systems, preventive and corrective maintenance.

COMPANY: SPIE NIG LTD
DATE: OCTOBER 2020-FEBRUARY 2021
CLIENT: TOTAL
POSITION:E&I TECHNICIAN
PROJECT: TURBINE GENERATOR/COMPRESSOR UPGRADE
LOCATION: OML 99 AMENAM KPONO
RESPONSIBILITIES:
*Identification of cable using Project cable schedule Document.
*Integrity test (Continuity & megger) Of identified cables prior to pulling.
*Pulling, arrangement Of cables inside cable tray/ladders.
*Fabrication & Installation of Instrument & JB supports using Unistrut channel
*Installation of Instruments, JB’s on supports and stanchions.
*Glanding & termination of installed cables On instruments, JB’s
*Loop checks On cabling systems
*Support commissioning team during commissioning & start up activities.

COMPANY: SPIE NIG LTD
DATE: APRIL – JULY 2020
CLIENT: AVEON OFFSHORE/FIRST E&P
POSITION: E&I TECHNICIAN /TUBE FITTER FOREMAN
PROJECT: ANYALLA WELLHEAD PLATFORM CONSTRUCTION & INSTALLATION
RESPONSIBILITIES: LEAD, INSTRUMENT TUBING INSTALLATION.
STUDY & INTERPRETATION OF P&IDs, Hook-up, and INSTALLATION DRAWINGS PRIOR TO INSTALLATION.
PLANNING & SHARING OF DAILY JOB RESPONSIBILITIES TO TEAM TECHNICIANS.
REPORTING OF DAILY JOB PROGRESS.
LEAK TESTING OF NEWLY INSTALLED INSTRUMENT TUBINGS

COMPANY: WELVIS NIG LTD
DATE: JANUARY – MARCH 2020
CLIENT : BELEMA OIL
POSITION: WELLHEAD CONTROL PANEL TECHNICIAN
PROJECT SCOPE: TURN AROUND MAINTENANCE, MODIFICATION OF LOGIC AND RECOMMISSIONING OF JACKET 1 WELLHEAD CONTROL PANEL.

COMPANY : SPIE NIGERIA(AVEON OFFSHORE BASE PHC)
DATE: OCTOBER – DECEMBER 2019
POSITION : LEAD, TUBING INSTALLATION FITTER FOREMAN
RESPONSIBILITIES : responsible for studying and interpreting P&IDs & Hook up drawings for WHCP, ESDVs, And Pressure transmitters connections.
PROJECT: TUBU wellhead platform hook-up
CLIENT: AMNI

COMPANY: ORBITAL AND ORANGES NIG LTD
DATE: AUGUST – OCTOBER 2019
POSITION: HYDROTEST FOREMAN
RESPONSIBILITIES : Sourcing of test pack and setting up of Pre-fab spools for hydrotest & technical support to E&I team.
PROJECT: ETIM LC GAS LIFT PROJECT, Offshore
CLIENT: EXXON MOBIL

COMPANY : Project Masters Nigeria limited (PMNL)
DATE: July 2018 – March 2019
POSITION : E&I Foreman
JOB DESCRIPTION :
* Support the E&I supervisor to study the P&IDs, Schematic and hook up drawings prior to construction and installation
* Plan daily and routine job activities together with the E&I supervisor
*Share job responsibilities to technicians on site
* Follow up supervision of technicians on assigned duties
*Perform Identification and integrity testing of cables prior to intallation
* Perform fabrication and installation of cable tray and supports
* Carry out bending and installation of instrument tubings
* Perform pulling and arrangement of cables inside pre installed cable tray
* Perform glanding and termination of power and instrument cables on junction boxes, lighting fixtures, ESSDS/DCS panels
* Perform calibration of instruments alongside third party vendors
* Perform Hydrotest on Pre Fabricated spools on company base & offshore
* Write and document job Daily progress report
* Responsible for ensuring my technicians follow and comply to all laid down safety procedures

COMPANY: Hazcon Nig. Ltd
DATE: APRIL JULY 2018
POSITION: LEAD. INSTRUMENT PANEL BUILDING (PNEUMATIC)
PROJECT: NJABA WELLHEAD CONTROL PANEL CONSTRUCTION
CLIENT: Addax Petroleum
JOB DESCRIPTION :
* Responsible for layout design of well Head Control Panel (WHCP) in line with specifications
* Responsible for schematic and Logic control design of WHCP and other associated components
* Responsible for instrument material checks and verification prior to installation
* Responsible for precise and accurate arrangement and installation of instruments (both internally and externally) on WHCP
* Supervision of panel building technicians
* Running of internal tubing wiring inside the WHCP
* Design and fabrication of Hydraulic reservoir tank
* Design of Cause and Effect for WHCP Logic
*Perform Factory Acceptance Test(FAT) with Client prior to load out from fab yard
*perform Pre commissioning of WHCP on site(NJABA FLOW STATION) imo state Nigeria
* Perform commissioning of WHCP and hand over to operations personnel

COMPANY: living proof controls ltd
DATE: December 2017-January 2018
POSITION :Instrument technician (foreman)
PROJECT :ODUDU well 10 & 12 hook-up
Total field.
JOB DESCRIPTION:
* Responsible for well 10 & 12 hook up
* Plan The E&I hook up procedures for both wells
* Bend and install instrument tubings for SCSSV, SSV, Wing valves, And process impulse lines.
* Conduct leak test on newly installed tubings

COMPANY: SPIE nig. ltd
DATE: September -December 2017
POSITION : instrument fitter
PROJECT : OSO gas turbine A-B revamp
EXXONMOBIL FIELD
JOB RESPONSIBILITIES:
* Perform all bending and installation of instrument tubings
* Modification of Local Control Panel LCP to integrate control for newly installed deluge systems and Fusible loops

COMPANY:PRIME AND HILLS ENERGY SERVICES LTD
DATE. :JULY 2017 – AUG 2017
POSITION :INSTRUMENTATION FITTER
PROJECT :MODIFICATION & RE-ARRANGEMENT OF EXISTING WELLHEAD CONTROL
TUBINGS – INSTALLATION OF FUSIBLE LOOP ON NEW WELL-HEAD AREA.
LOCATION:WEST -FAULT -BLOCK EBOK FIELD -ORIENTAL ENERGY.

COMPANY: ORBITAL AND ORANGES NIG LTD (O&O)
DATE. : DECEMBER 2016 – JULY 2017
POSITION : ELECTRICAL AND INSTRUMENT TECHNICIAN
PROJECT. : ABO TOUCH -UP MAINTANANCE
LOCATION : ABO FPSO (AGIP FIELD) OFFSHORE
JOB RESPONSIBILITIES:
* REPLACING OLD EXISTING 1″ & 3/4″ TUBING ON CHEMICAL INJECTION AND GAS LIFT SKID
* RUNNING OF NEW 1″ & 3/4″ TUBINGS ON CHEMICAL INJECTION AND GAS LIFT SKID

COMPANY: SPIE NIGERIA LIMITED
DATE: AUGUST, 2016 DECEMBER 2016
POSITION: INSTRUMENT TECHNICIAN/FITTER
PROJECT: TOTAL OFON D3 AND D5 PROJECT
LOCATION: OFFSHORE (TOTAL OFON FIELD)
JOB DESCRIPTION:
* CARRY OUT BENDING AND INSTALLATION OF INSTRUMENT TUBINGS ON PRESSURE TRANSMITTERS, INSTRUMENT AIR SUPPLY, FUSIBLE LOOPS, ESD STATIONS, IMPULSE LINES. ETC

COMPANY: CONSTRUCTION SERVICES INTERNATIONAL (CSI)
DATE: APRIL 2016- JUNE 2016
POSITION: INSTRUMENT FITTER
PROJECT: TOTAL OFON D3 AND D5 PROJECT
LOCATION: NIGER-DOCK YARD, SNAKE ISLAND LAGOS
JOB RESPONSIBILITIES:
* LEAD A TEAM OF TECHNICIANS TO BEND, RUN AND INSTALL INSTRUMENT TUBINGS.
* PERFORM CABLE PULLING AND ARRANGEMENT INSIDE CABLE TRAY.

COMPANY: PROJECT MASTERS NIGERIA LIMITED
DATE: 2012 – 2015
POSITION: E&I FOREMAN/HYDROTEST TECHNICIAN

COMPANY: FITTECH NIGERIA LIMITED
DATE: 2009
POSITION: INSTRUMENTATION AND CONTROL TRAINEE

COMPANY: AVEON OFFSHORE / CONSTRUCTION SERVICES INTERNATIONAL (CSI)
DATE: JANUARY MAY 2012
POSITION: TUBING FITTER
LOCATION: OLERO/DIBI COMPRESSOR STATIONS, CHEVRON FACILITY
PROJECT: ONSHORE ASSET GAS MANAGEMENT PROJECT (OAGM)
DUTIES: FABRICATION / INSTALLATION OF INSTRUMENT TUBING AND TRAYS.

COMPANY: SAIPEM (CONFIDENCE ENGINEERING SERVICES)
DATE: NOVEMBER 2011-JANUARY 2012
POSITION: INSTRUMENT FITTER
LOCATION: FPSO MYSTRAS (AGIP FIELD)
PROJECT: OKONO UPGRADE
DUTIES: FABRICATION/INSTALLATION OF INTRUMENT TUBINGS
CONNING & DICING OF AUTO-CLAIVE HIGH PRESSURE TUBINGS &
FITTINGS

COMPANY: ORBITAL & ORANGES NIG LTD (O&O)
DATE: JULY-NOVEMBER 2011
LOCATION: SENDJE BERGE (FPSO) ADDAX [OKWORI] FIELD
POSITION: INSTRUMENT TECHNICIAN
DUTIES: FABRICATION/INSTALLATION OF INSTRUMENT TUBINGS
CALIBRATION OF INSTRUMENTS

COMPANY: SUDELETTRA NIGERIA LTD
DATE: FEBRUARY JUNE 2011
POSITION: INSTRUMENT FITTER
LOCATION: CHEVRON NIGERIA LTD – ABITEYE/UTONANA PRODUCTION FACILITY
PROJECT: ONSHORE ASSET GAS MANAGEMENT PROJECT (OAGM)

DUTIES:
RUNNING AND INSTALLATION OF ALL INSTRUMENT TUBING LINES
2. FABRICATION AND INSTALLATION OF LADDER TRAYS FOR TUBINGS & CABLES
3. MODIFICATION OF MASTER CONTROL PANEL (MCP) INTERNAL INSTRUMENT TUBING CONNECTIONS
4. INSTALLATION OF PRESSURE SWITCHES AND CONNECTION OF PROCESS TUBINGS.
5. TERMINATION OF INSTRUMENT CABLES AND TUBINGS ON MASTER CONTROL PANEL (MCP)
6. CONNECTION AND CONFIGURATION OF TUBINGS ON SHUTDOWN VALVE (SDV)
7. PNEUMATIC & HYDRAULIC LEAK TEST ON INSTALLED TUBING LINES
8. TUBING CONNECTION ON GAS CONDITONING SKID (GCS) AND BAZOOKA PROCESS PIPING.

COMPANY: PROJECT MASTERS NIG. LTD
DATE: JULY 2009 JANUARY 2011
POSITION: INSTRUMENT TECHNICIAN
LOCATION: EXXON MOBIL FIELD OFFSHORE LOCATION,
UBIT GG, UBIT GK, UBIT GJ, EDOP QB, ETIM LP, INIM PP
USARI FC, IDOHO PP, UTUE B, ENANG JA
DUTIES:
1. FABRICATION AND INSTALLATION OF TUBING & CABLE TRAYS
2. CALIBRATION OF PRESSURE SWTICH & BARTON RECORDER
3. CONNECTION, TIE-IN & HOOK UP OF PSL, PSH, SAND PROBE SDV PILOT SIGNAL, SSV SIGNAL, SCSSV HYDRAULIC SIGNAL FROM WELHEAD CONTOL PANEL TO CHRISTMAS TREE
4. FABRICATION OF INSTRUMENT STRUCTURES & SUPPORTS
5. DEMOLITION OF OLD INSTRUMENT CABLES, TUBINGS, TRAYS SUPPORTS AND INSTALLATION OF NEW ONES.
6. BUILDING OF SDV PANEL FOR PIG LAUNCHER
7. INSTALLATION OF (TSE) FUSIBLE/FIRE LOOP CONTROL SYSTEMS
8. INSTALLATION OF LIGHTING FIXTURE AND TERMINATION OF LIGHTING LAMPS
9. BUILDING OF INSTRUMENT PRESSURE PILOT RACK
10. PNEUMATIC & HYDRAULIC LEAK TEST ON INSTALLED TUBING LINES
11. CHANGE OVER FROM INSTRUMENT GAS TO AIR

 

PROJECT SUMMARY
ONSHORE ASSET GAS MANAGEMENT PROJECT (OAGM) CHEVRON NIG LTD
OFFSHORE CONSTRUCTION AND INSTALLATION PROJECT (OCIP) EXXON MOBIL
EDOP QB WELL REDEVELOPMENT AND GAS LIFT PROJECT
UBIT GG SLOT ADDITION PROJECT
ETIM PP LIFE EXTENSION (RESTORATION) PROJECT (LEP)
ETIM PP PIG LAUNCHER PROJECT
UBIT GG GAS LIFT PROJECT
ENANG JE DECK EXTENSION PROJECT
INIM RESTORATION PROJECT

REFERENCES