Muthuselvam

Photo

Land Surveyor
Location: Doha, Qatar


MUTHUSELVAM  S

1/76, North Street,

Sivakasi

Tamilnadu

India, Pin-626131.

Phone       :+919843518443

: +974 7005 6277

E-mail  : [email protected]

Skype   : smselvam3

Objectives

To obtain a Professional Land Surveyor position and to contribute to the success of the company.

Academic chronicle:

COURSE : SSLC
INSTITUTION UNIVERSITY/BOARD : GOVT HIGHER SECONDARY SCHOOL, VIJAYAKARISALKULAM/TAMAILNADU STATE BOARD.
YEAR OF PASSING : 2009

COURSE : D.C.E (DIPLOMA IN CIVIL ENGINEERING)
INSTITUTION UNIVERSITY/BOARD : ARULMIGU KALASALINGAM POLYTECHNIC COLLEGE, TAMILNADU STATE BOARD
YEAR OF PASSING : 2012

Additional Approval:

Ø  Approved W.S.S (PTW & CPW card holder) by Mesaieed Operations, Qatar Petroleum.

Ø  Approved W.S.S (PTW card holder) by Dukhan Fields, Qatar Petroleum.

College Project:

⮚      Done the project on “ Improving the strength of concrete using natural and artificial material” at Arulmigu Kalasalingam polytechnic college in Krishnan kovil.

Employment profile:

⮚      LAND SURVEYOR at RAY PROJECTS ENGINEERS AND CONTRACTORS (WLL), QATAR

⮚      LAND SURVEYOR at ALGHANIM INTERNATIONAL GENERAL TRADING & CONTRACTING CO., KUWAIT

⮚      SITE ENGINEER at RENAATUS PROJECTS PVT LTD,CHENNAI

⮚      TECHNICAL SUPERVISOR at AKR CONSTRUCTION,RAJAPALAYAM

RAY PROJECTS ENGINEERS AND CONTRACTORS (WLL)

Project:

Construction of 3 Duct bank at NGL-3&4 and 2 Nos Culvert at NGL Complex Project awarded byM/s.Qatar Petroleum to M/s.Ray projects engineers and contractors WLL.

EPIC FOR CNG STATION IN MIC AND RLIC Project awarded by M/s.BLACK CAT to M/s.Ray projects engineers and contractors WLL.

Provision of crash barrier and safety markers for various pipelines in Dukhan fieldsProject awarded by M/s. Qatar Energy to M/s. Ray projects engineers and contractors WLL.

Providing new kerbing and bundwallheight increase inside units at Qatar Energy Refinery, Mesaieed Project awarded by M/s. Qatar Energy to M/s. Ray projects engineers and contractors WLL.

Role : As a Land Surveyor from November 2018 TO May 2022

Responsibilities:

⮚     Carrying out initial surveys using Auto level, Total station and GPS.

⮚     Carrying out survey data calculations.

⮚     Reading and interpreting Auto CAD drawings.

⮚     Coordinate with Clients for the inspection of survey works.

⮚     Preparing Survey Report and sketch for clients and management.

⮚     Carrying out Stake-out, As built, reference line marking, Arc marking and etc., using GPS & Total Statn

⮚     Responsible for collection of data computation points in the field.

⮚     Ensuring final/approved drawings/reports are issued to clients and Ensure equipments calibration.

ALGHANIM INTERNATIONAL GENERAL TRADING & CONTRACTING CO.

Project:

The KIPIC Al-Zour Oil Refinery Project awarded by M/s. FDH JV to M/s. Alghanim International General Trading & Contracting Co.,Oil &Gas  Division Includes various constructions , Road Works, Pipe lines (RCC, GRP, GRE, PVC)

Role : As a  Land Surveyor from Aug 2017 TO Aug 2018

Responsibilities:

⮚     Carrying out initial surveys using GPS and Total Station.

⮚     Accurate survey for making Permanent and temporary benchmark.

⮚     Preparing Survey reports and getting approval from client.

⮚     Verifying the accuracy of survey data, including measurements and calculations conducted at various sites

⮚     Conducting topographical, as-built surveys and provide detail plan with cross and longitudinal section

⮚     Verifying Accuracy of all survey data through calculations

⮚     Carrying out Stake-out, reference line marking, Arc marking and etc., using GPS & Total Station

RENAATUS PROJECTS PVT. LTD.

Project:

The Construction of Dr.Ambedkar Law University at Taramani Project awarded by M/s.Public Works Department of Tamilnadu to M/s.RPP Ltd.,

Role : As a Site Engineer from March 2014 TO July 2017.

Responsibilities:

⮚     Preparing  day to day work Plan Schedule, Manpower Schedule, Materials Schedule, Funding requirement etc.,

⮚     Interpretation of Drawings.

⮚     Preparing Bar Bending Schedule, Concrete quantity and Shuttering measurements.

⮚     Preparing Daily Labor Reports, daily out-turn reports, Measurement book and abstracts.

⮚     Allotting to the labors.

⮚     Monitoring the work on site whether it is progressing as per drawings or not.

AKR CONSTRUCTION

Project:

The Project awarded by M/s.Highway Department to M/s. AKR Construction includes Road Works, Minor Bridges, Widening.

Role : As a Technical Supervisor from July 2012 TO November 2013.

Responsibilities:

⮚     Preparing man power chart.

⮚     Ensure Shuttering, reinforcement, concrete quality standards and ensure conformance as per specifications.

⮚     Preparing Bills, Measurement book and abstract.

⮚     Coordinate with clients for inspection

Technical Skills:

⮚     Auto CAD

⮚     Basic Computer Knowledge, MS-Office

⮚     Software Skills

⮚     Global Positioning System (Leica GS14)

⮚     Total Station

Area of Interest :

⮚     Surveying

⮚     Construction Supervision

⮚     Construction Management

Strengths:

⮚     Hardworking

⮚     Leadership skills

⮚     Team work and positive attitude

⮚     Good communication skills

Language:

Tamil
Read
Write
Speak
English
Read
Write
Speak
Hindi


Speak

Personal Information:

Date of birth : 16/05/1994
Sex : Male
Marital Status : Single
Nationality : Indian
Mother Tongue : Tamil
Hobbies & interests : Music, Reading books, Sports & Travel
Passport Information

⮚      Place of Issue                      :           Madurai

 

Declaration

 

I hereby declare that all the above information is true to the best of my knowledge and beliefs. I am also assuring complete dedication hard work towards the organization if provided an opportunity.

 

Thank you,

MUTHUSELVAM SELVARAJ

  • Construction, Engineering
  • Updated 1 year ago

Only Employers can view Contact Details. Request Access